Learning Outcomes
SLO | After this lecture you can… | CLO | Bloom |
|---|---|---|---|
SLO 3.1 | Explain how the learning curve, volume and commoditization lower the cost of computers. | CLO1 | C2 Understand |
SLO 3.2 | Calculate dies per wafer, die yield and the cost of a die for a given chip size. | CLO2 | C3 Apply |
SLO 3.3 | Calculate MTTF, failure rate and availability of a system and show how redundancy helps. | CLO2 | C3 Apply |
§1 Trends in Cost
§1.1 The learning curve
Slide L03-S06
The learning curve means manufacturing cost falls as a factory gains experience. The main measure is yield: the percentage of manufactured devices that pass testing. A new production line has low yield; as engineers find and remove the causes of defects, yield rises and each good chip costs less. Example: a new tandoor wastes many burnt rotis in its first week but almost none after a month - the same oven, more experience.
§1.2 Volume and commoditization
Slide L03-S07
- Volume: a larger volume climbs the learning curve faster, makes buying and manufacturing more efficient, and spreads the one-time design cost over more units. Rule of thumb (Hennessy and Patterson): cost falls about 10% for each doubling of volume.
- Commodity: a product sold in large volume by many vendors in nearly identical form (DRAM, flash, disks, keyboards). Competition pushes the price close to the cost. Example: USB drives and mobile chargers in any electronics market.
§2 The Cost of an Integrated Circuit
§2.1 From wafer to chip
Slide L03-S09
A wafer is a thin, round disc of silicon (30 cm across in modern factories). Many identical dies (the rectangular pieces that become chips) are made on it together. The wafer is tested, cut into dies, the good dies are packaged (placed in a plastic or ceramic case with pins) and tested again.
Roti analogy: Cutting square pieces from a round roti wastes the edges, and a burnt spot ruins whichever piece it falls on. A bigger piece is more likely to contain a burnt spot. That is why large dies cost much more. |
§2.2 The formulas
Slide L03-S10
Cost of IC = (cost of die + cost of testing die + cost of packaging and final test) / final test yield |
Source: Hennessy and Patterson (2012), §1.6. Assume wafer yield = 100% unless the question gives another value.
§2.3 Worked example: big die vs small die
Slide L03-S11
30 cm wafer, D = 0.031 defects per cm², N = 13.5, wafer cost $5,000.
Big die, 1.5 cm x 1.5 cm = 2.25 cm^2: |
A die 2.25 times larger costs about 4 times more, because fewer dies fit on the wafer and each is more likely to contain a defect.
§2.4 Cost vs price
Slide L03-S12
Cost is what it takes to make one unit. Price is what the customer pays: cost plus research and development, marketing, sales, warranty and profit (together called the gross margin). NRE (non-recurring engineering) cost is a one-time cost such as design work and the set of masks used to print the chip; it is shared over all units sold, so a chip made for a small market is expensive per unit.
§3 Dependability
§3.1 Measures
Slide L03-S14
Term | Meaning | Formula / unit |
|---|---|---|
MTTF | Mean time to failure: average working time before a failure | hours |
MTTR | Mean time to repair: average time to fix after a failure | hours |
MTBF | Mean time between failures | MTTF + MTTR |
Availability | Fraction of time the system is working | MTTF / (MTTF + MTTR) |
Failure rate | Failures per hour | 1 / MTTF |
FIT | Failures in time: failures per 10^9 hours | 10^9 / MTTF |
Example: a UPS works 2,000 hours between failures and takes 48 hours to repair. Availability = 2,000 / 2,048 = 0.977 = 97.7%.
§3.2 Worked example: MTTF of a system
Slide L03-S15
If failures are independent and each part has a constant failure rate, the failure rates of the parts add.
10 disks (MTTF 1,000,000 h), 1 controller (500,000 h), 1 power supply (200,000 h), |
§3.3 Redundancy
Slide L03-S16
Redundancy means having a spare part so that one failure does not stop the system. With two power supplies, the system fails only if the second fails while the first is being repaired.
MTTF(pair) = MTTF^2 / (2 x MTTR) |
Example: a home with both a UPS and a generator loses power during load shedding only if both fail together.
§4 Common Mistakes
Slide L03-S18
Wrong idea | Correct idea |
|---|---|
A die twice as big costs twice as much. | Cost grows faster than area: fewer dies per wafer and lower yield. |
Cost and price are the same. | Price = cost + R&D, marketing and profit (gross margin). |
System MTTF = average of the parts' MTTFs. | Add the failure rates (1/MTTF) and take 1 / total. |
MTBF and MTTF are the same. | MTBF = MTTF + MTTR. |
Word Bank
Word | Simple meaning | Real-world example |
|---|---|---|
Wafer | Thin round disc of silicon on which chips are made | A round roti before it is cut |
Die | One rectangular piece of a wafer that becomes a chip | One square piece of the roti |
Yield | Percentage of manufactured items that work | Good rotis out of 100 made |
Defect density | Number of faults per cm² of wafer | Burnt spots per roti |
Learning curve | Cost falls as a factory gains experience | A new baker improves in a month |
Commodity | Product sold by many vendors, nearly identical | Mobile chargers, USB drives |
NRE | One-time design and setup cost | Cost of making a new mould before printing toys |
Gross margin | Price minus cost: pays for R&D, marketing, profit | Shop's profit on a phone |
MTTF / MTTR | Average time before failure / time to repair | UPS working time / repair-shop time |
Redundancy | A spare part to take over on failure | UPS plus generator |
Self-Check Questions
- What is the learning curve? How is it related to yield? (§1.1)
- Why does volume lower cost? Give the rule of thumb. (§1.2)
- What makes a product a commodity? Give two examples. (§1.2)
- Write the formulas for cost of die, dies per wafer and die yield. (§2.2)
- Find the dies per wafer for a 20 cm wafer and a 1.0 cm² die. (§2.3)
- Explain why a die 2.25 times bigger costs about 4 times more. (§2.3)
- What is NRE cost and why does it matter for small markets? (§2.4)
- A server has MTTF 50,000 h and MTTR 10 h. Find its availability. (§3.1)
- Find system MTTF for parts with MTTF 100,000 h (two of them), 20,000 h and 40,000 h. (§3.2)
- Why does a second power supply increase MTTF so much? (§3.3)
Answers: 269 dies; availability 99.98%; system MTTF = 1 / (2/100,000 + 1/20,000 + 1/40,000) = 10,526 hours.
Further Reading
- Hennessy and Patterson (2012): Chapter 1, sections 1.6 (trends in cost) and 1.7 (dependability).