Lecture 2: Software Process Models (Prescriptive)

Lecture Slides SE-401 Software Engineering 9 min read Updated 8 Nov 2026

↓ Download slides (PowerPoint)

Slide 2

Last lecture in one minute

Specification

Development

Validation

Evolution

Decide what the software must do

Design and build it

Check it is what users need

Change it over time

Today: every team does these four activities. A process model is a plan that tells the team in what order to do them, and how many times to repeat them.

SE Lecture 2

Recap

Sheet 02 of 19

Slide 3

By the end of today, you will be able to

Explain what a software process and a process model are

Compare plan-driven and agile ways of working

Describe four models: Waterfall, Incremental, Integration and configuration, and Spiral

Say what each model is good at, and where it fails

Explain why change is the main problem every model must handle

Choose a model for a real project and give reasons

SE Lecture 2

Objectives

Sheet 03 of 19

Slide 4

Today's plan: 60 minutes

0-5 min

Welcome, recap, your questions

5-12 min

What a process model is; plan-driven vs agile

12-22 min

The Waterfall model and the V-model

22-30 min

Incremental development

30-35 min

Integration and configuration (reuse)

35-42 min

The Spiral model, and dealing with change

42-52 min

Group activity: choose the model

52-60 min

Comparison, key points, homework, exit ticket

SE Lecture 2

Plan

Sheet 04 of 19

Slide 5

Process and process model

Software process

Real-world example: biryani

The steps a team actually follows to build one software system.

  • A biryani recipe is like a process model: the general steps everyone knows.
  • What your mother actually does in her kitchen today is the process. Every home changes the recipe a little, but it is still biryani.

Process model

A general plan for how to build software. Teams change it to fit their project. It is a guide, not strict rules.

Word help

model = a simple picture or plan of something real framework = a basic structure you build on

SE Lecture 2

Concepts

Sheet 05 of 19

Slide 6

Plan-driven or agile? A range, not two teams

Plan-driven

Agile

Waterfall

V-model

Spiral

Incremental

Scrum, XP

Plan-driven

Agile

Plan everything first, then follow the plan. Progress = how much of the plan is done.

Plan a little, build a little, learn, and change the plan often.

Example: building a motorway. The route, bridges and budget are fixed before work starts.

Example: a food delivery app. The team adds and changes features every few weeks based on what customers do.

Word help

agile = quick and able to change direction easily

SE Lecture 2

Concepts

Sheet 06 of 19

Slide 7

The Waterfall model: one step after another

  • Requirements
  • What must the system do?

Real-world example: building a house

  • Design
  • How will it be built?
  • First the map, then the foundation, then walls, then the roof.
  • If you want a basement after the roof is built, it is very costly. Waterfall software works the same way.
  • Coding and unit testing
  • Write and test each part
  • Integration and system testing
  • Join parts, test the whole
  • Operation and maintenance
  • Use it, fix it, improve it

Word help

sign off = formally approve a step before moving on maintenance = fixing and improving software after it is in use

SE Lecture 2

Waterfall

Sheet 07 of 19

Slide 8

When Waterfall works, and when it hurts

Use it when

Watch out for

  • Requirements are clear and will not change much
  • The system is safety-critical and needs full checks and documents
  • Software is part of a hardware project with a fixed schedule
  • A fixed contract needs an approved specification first
  • Big decisions are made early, when we know the least
  • Working software appears only near the end
  • Customers see the product too late to change it cheaply
  • Problems are pushed to later and patched afterwards

Real-world example: a final year project where the proposal is approved in semester 7 and shown only at the end of semester 8. Often the team discovers too late that they built the wrong thing.

SE Lecture 2

Waterfall

Sheet 08 of 19

Slide 9

The V-model: plan the tests while you plan the system

Requirements

Acceptance testing

Real-world example: car airbag

System design

System testing

  • Requirement: "open within a fraction of a second after a crash."
  • The test for it is planned on day one, not after coding. Car companies use the V-model for this reason.

Detailed design

Unit and integration testing

Coding

Each step on the left is checked by the matching test on the right (dashed lines).

Word help

verify = check that something is correct acceptance testing = the customer checks if the system is acceptable

SE Lecture 2

Waterfall

Sheet 09 of 19

Slide 10

Incremental development: build in small pieces

Done together, again and again

Specification

Version 1

  • Word help
  • increment = a small part that is added each time
  • version = one release of the software

Outline description

Development

Versions 2, 3, 4...

Validation

Final version

Real-world example: WhatsApp grew one piece at a time

  • 2009
  • Status updates
  • Then
  • Messaging
  • Later
  • Groups, voice notes
  • Later
  • Voice and video calls
  • Recently
  • Channels, payments

SE Lecture 2

Incremental

Sheet 10 of 19

Slide 11

Incremental development: good and bad

Benefits

Problems

  • Changes cost less, because less work must be redone
  • Users try real software, not long documents
  • Useful software reaches users early
  • Managers find it harder to see progress
  • The code gets messy as pieces are added, unless the team cleans it up (refactoring)
  • Hard for very large systems where many teams need a fixed structure early

Real-world example: a house where a new room is added every few years without a plan. Each room is useful, but soon the stairs are in strange places and the wiring is a mess. Code becomes like this without refactoring.

SE Lecture 2

Incremental

Sheet 11 of 19

Slide 12

Integration and configuration: build less, reuse more

1. Requirements

2. Search

3. Adjust needs

4. Set up and connect

Write the basic needs

Find existing software that fits

Change needs to match what exists

Configure, join parts, add new code

Ready-made systems

Code libraries

Online services (APIs)

Real-world example

e.g. Moodle set up for a university

e.g. packages from PyPI or npm

e.g. JazzCash payments, Google Maps

Buying ready-made furniture and arranging it in your room, instead of making every chair yourself. Faster and cheaper, but you get the sizes the shop has.

Word help

configure = set up the settings to fit your needs integrate = join separate parts so they work together

SE Lecture 2

Reuse

Sheet 12 of 19

Slide 13

The Spiral model: deal with the biggest risk first

1. Set goals

2. Find and reduce risks

  • Each loop of the spiral is one round of work, and it passes through four steps.
  • Before each round, the team asks: what could go most wrong right now?
  • They deal with that risk first, often by building a small test version.

Real-world example: crop disease app

The biggest risk: can AI find diseases from cheap phone photos? Loop 1 tests only this on 200 photos. If it fails, the team stops early and loses little.

4. Plan the next loop

3. Build and test

Word help

risk = something that might go wrong prototype = a quick early sample version

SE Lecture 2

Spiral

Sheet 13 of 19

Slide 14

Every model is really an answer to change

Plan for change early

Make change cheap

Build a prototype so users can react before the real work starts.

Deliver in small pieces, so a change only affects the pieces not built yet.

Example: Like a tailor's trial fitting: he checks the sizes with you before final stitching.

Example: Like changing the menu of a new restaurant week by week, instead of printing 10,000 fixed menus on day one.

Throwaway prototype = thrown away after learning. Evolutionary prototype = grows into the real product.

This is what Incremental development does.

Why change is costly: one new requirement can mean new design, new code and new tests.

SE Lecture 2

Change

Sheet 14 of 19

Slide 15

Activity: choose the model

Each group gets one project. Choose a model, give two reasons, and name one risk your model handles badly.

A. Spraying drone

B. Farmer marketplace

Software that flies a crop-spraying drone. Strict safety rules. Hardware is ready in 12 months.

A startup app that connects Punjab farmers to buyers. The founders are not sure what farmers will use.

minutes

C. University library

D. National tax system

UAF wants an online library catalogue and book loans. Good free library systems already exist.

Replace a national tax system. Huge budget, new technology, big risk if it fails.

  • 6 min in groups of 4-5
  • 4 min to share answers

SE Lecture 2

Activity

Sheet 15 of 19

Slide 16

The four models side by side

Real projects often mix models. There is no best model, only the best fit for a project.

SE Lecture 2

Comparison

Sheet 16 of 19

Slide 17

Key points to remember

A process model is a general plan that teams change to fit their project.

Plan-driven and agile are two ends of a range. Most teams mix them.

Waterfall: good for stable, safety-critical work, but change is costly.

Incremental: change is cheap and users get software early, but code needs regular cleanup.

Integration and configuration: reuse existing parts to save time, but you lose some control.

Spiral: deal with the biggest risk first.

SE Lecture 2

Wrap-up

Sheet 17 of 19

Slide 18

Before the next lecture

Read

Assignment 2: process memo (team)

Sommerville, Software Engineering, 10th ed., Chapter 2, sections 2.1 to 2.3.

One page about your semester project:

  • What problem it solves, and for whom
  • Which process model you will follow
  • Two reasons it fits your project
  • One risk your model handles badly, and what you will do about it

Look ahead

Read the Agile Manifesto at agilemanifesto.org (one page). Next lecture: Agile development and Scrum.

SE Lecture 2

Homework

Sheet 18 of 19

Slide 19

Exit ticket

On a small piece of paper, with your name and roll number:

Name one project where Waterfall is the right choice, and say why in one sentence.

One question you still have after today.

Questions?

SE Lecture 2

Exit ticket

Sheet 19 of 19